Generator Guides

Generator Quotation Checklist: Phase, Prime & Standby Power

Choosing a generator is easier when the inquiry starts with your electrical requirements, rather than a long list of unfamiliar model numbers. This checklist explains what to send to UOFO POWER / Philippine Power Services Trade Inc. when requesting a diesel generator quotation in the Philippines.

1. Confirm the required phase and voltage

Tell us whether your project requires single-phase or three-phase power, and the required voltage if known. Your electrical engineer or electrician should confirm these against the site’s system and equipment. Capacity alone does not establish the correct phase.

2. State the capacity and the rating you mean

Share the required kVA and/or kW and specify whether it is a prime or standby power requirement. Our product pages present these ratings separately. Do not substitute a standby rating for the prime rating when comparing configurations. If you do not yet have a confirmed capacity, send the equipment list and available load information for discussion; this checklist is not an engineering sizing calculation.

3. Choose an engine preference, or leave it open

Our catalog has Cummins, Isuzu, UOFOPOWER, Weichai, Baudouin and JMCG / Isuzu Forward groupings, alongside air-cooled generators. If you do not have an engine preference, tell us your application and operating needs first. The JMCG / Isuzu Forward label follows our supplier catalog; confirm the exact engine model rather than assuming manufacturer affiliation.

4. Describe the application and operating conditions

Explain what the generator will power and how it will be used. Include the equipment list, intended duty and relevant site conditions where available. Starting loads, installation arrangements and electrical compatibility need project-specific review, so avoid choosing a unit solely from a headline capacity.

5. Add the site location when available

A city or project location helps our team discuss delivery and service coordination. You can make an initial inquiry without it and provide the details later. Do not assume delivery or installation charges are included unless the written quotation says so.

You do not need to select an alternator model first

Share the electrical requirements you know. The catalog records alternator models for documented configurations, but you do not need to identify one before contacting us. Our team can discuss the available configurations with you.

Check the selected product’s specifications

Click a product in the generator catalog to view its supplied prime and standby ratings, engine and alternator models, phase, voltage, frequency and cooling details where available. Dimensions from the estimated-dimension list are estimates and must be confirmed before site preparation. Missing dimensions and unverified weights remain blank. Generic catalog images are illustrations, not a promise of an exact enclosure.

Example: check both ratings on the product page

The Cummins KTA50-G3 generator configuration lists 1575 kVA standby and 1375 kVA prime power. These are separate duty ratings, not interchangeable capacities. This is a reading example, not a sizing recommendation for your site. Check the documented specifications and ask our team to confirm suitability for your load and operating requirement.

For site work or an existing unit, see our generator installation, commissioning and maintenance services.

A short inquiry you can copy

We need a [single-phase / three-phase] diesel generator for [application]. Our required capacity is [kVA and/or kW], for [prime / standby] use. Preferred engine brand: [brand / open to recommendation]. Required voltage: [if known]. Site location: [optional]. Please confirm the specifications, availability and quotation.

Do not worry if some fields are unknown. Say which details still need confirmation rather than guessing.

Contact UOFO POWER

Send a quotation inquiry, email sale@power-services.com.ph, or call +63 931 177 9709. You can also use our official contact channels. For dealership discussions, visit the dealer partnership inquiry page. For more answers, see our generator FAQs.